RP.SR154SB TO I80E over SR-154 NBL (40TH W.)
I-80 Airport Int. · County 035, Utah · Built 1986 · 2 Lanes · 62,550 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.764669, -111.987042
This bridge is in worse condition than 79.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 40 years old.
Nearby Bridges
SR-154SB (BNGTR.H) over I-80 (SR-80) EBL & W
Built 1986
SR-154NB (BNGTR.H) over I-80 (SR-80) EBL & W
Built 1986
RP.SR154SB TO I80E over I-80 (SR-80) & RAMPS
Built 1986
RP.I80EtoN.Tpl.RP over RP.SR-154NB TO I-80EB
Built 1986
RP.I80WB to SR154N over RP.SR-186WB to I-80WB
Built 2001
SR-154SB & ON- over UNION PACIFIC RAILROAD
Built 1986
SR-154NB & OFF over UPRR & SL&GWRR
Built 1986
AIRPT.ENTR.RD over SURPLUS CANAL
Built 1980
X-BAR ROAD over SB. EXIT FROM AIRPORT
Built 2005
EXIT FROM AIRPORT over NB.ENTRANCE TO AIRPORT
Built 2006
Bridge Details
- Structure #
- 2C 633
- Year Built
- 1986
- Length
- 163.1 m (535.1 ft)
- Max Span
- 81.1 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 62,550
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.