RP.SR154SB TO I80E over SR-154 NBL (40TH W.)

I-80 Airport Int. · County 035, Utah · Built 1986 · 2 Lanes · 62,550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2C 633
Year Built
1986
Length
163.1 m (535.1 ft)
Max Span
81.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
62,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.