SR-154NB & OFF over UPRR & SL&GWRR
SOUTH OF AIRPORT INTCHG. · County 035, Utah · Built 1986 · 3 Lanes · 21,510 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.758308, -111.986761
This bridge is in worse condition than 79.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 40 years old.
Nearby Bridges
SR-154SB & ON- over UNION PACIFIC RAILROAD
Built 1986
SR-154NB (BNGTR.H) over 700 SOUTH STREET
Built 1985
SR-154SB (BNGTR.H) over 700 SOUTH STREET
Built 1985
SR-154NB (BNGTR.H) over UNION PACIFIC RAILROAD
Built 1985
SR-154SB (BNGTR.H) over UNION PACIFIC RAILROAD
Built 1985
RP.SR154SB TO I80E over I-80 (SR-80) & RAMPS
Built 1986
SR-154NB (BNGTR.H) over I-80 (SR-80) EBL & W
Built 1986
RP.SR154SB TO I80E over SR-154 NBL (40TH W.)
Built 1986
RP.I80EtoN.Tpl.RP over RP.SR-154NB TO I-80EB
Built 1986
SR-154SB (BNGTR.H) over I-80 (SR-80) EBL & W
Built 1986
Bridge Details
- Structure #
- 1C 668
- Year Built
- 1986
- Length
- 63.3 m (207.7 ft)
- Max Span
- 31.3 m
- Width
- 24.8 m (81.4 ft)
- Lanes
- 3
- Daily Traffic
- 21,510
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.