I-84 (SR-84) EBL over WEBER RIVER AND UPRR

BELOW UP&L RESERVOIR · County 029, Utah · Built 1965 · 2 Lanes · 19,585 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
2C 476
Year Built
1965
Reconstructed
2009
Length
177.5 m (582.3 ft)
Max Span
35.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
19,585
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.