I-15NB (SR-15) over 500 WEST ST. in PROVO

1200 SO. 500 W. in PROVO · County 049, Utah · Built 2011 · 5 Lanes · 135,161 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1F 827
Year Built
2011
Length
40.6 m (133.2 ft)
Max Span
38.4 m
Width
27.1 m (88.9 ft)
Lanes
5
Daily Traffic
135,161
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.