i-215NB (SR-215) over JORDAN RIVER

I-215 N.over Jordan Rvr. · County 035, Utah · Built 2008 · 2 Lanes · 35,765 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
1F 747
Year Built
2008
Length
38.4 m (126 ft)
Max Span
36.6 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
35,765
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.