SR-67NB.LEGACY PW. over NW.OIL DRAIN CHANNEL

Within I-215 Legacy Int. · County 011, Utah · Built 2008 · 2 Lanes · 34,660 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1F 703
Year Built
2008
Length
33.8 m (110.9 ft)
Max Span
32 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
34,660
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.