I-15 (SR-15) NBL over SR-99 INTCHG. X-ROAD

NO.FILLMORE INTERCHANGE · County 027, Utah · Built 1972 · 2 Lanes · 24,744 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
1F 203
Year Built
1972
Length
52 m (170.6 ft)
Max Span
25.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
24,744
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.