SR-99 over CHALK CREEK

300 NORTH IN FILLMORE · County 027, Utah · Built 1934 · 2 Lanes · 6,355 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0D 600
Year Built
1934
Reconstructed
1957
Length
15.2 m (49.9 ft)
Max Span
13.7 m
Width
21.4 m (70.2 ft)
Lanes
2
Daily Traffic
6,355
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.