NB Bangerter Hwy over 9000 S (SR 209)

9000 S and Bangerter · County 035, Utah · Built 2018 · 3 Lanes · 47,707 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1C1045
Year Built
2018
Length
60 m (196.9 ft)
Max Span
60 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
47,707
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.