CENTER STREET over BEAVER CREEK

25 W. CENTER ST. IN KAMAS · County 043, Utah · Built 1950 · 2 Lanes · 95 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
043049E
Year Built
1950
Reconstructed
1975
Length
8.1 m (26.6 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
95
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.