ZION - MOUNT CARME over CLEAR CREEK

FROM SOUTH ENTRANCE GO 1 · County 025, Utah · Built 1993 · 2 Lanes · 3,682 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1590007P0000000
Year Built
1993
Length
35.4 m (116.1 ft)
Max Span
17.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
3,682
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$25,000
Total Project Cost
$38,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.