ZION - MNT CARMEL over NORTH FORK VIRGIN RIVER

1.4 MI FROM S. ENTRANCE · County 053, Utah · Built 1930 · 2 Lanes · 1,341 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1590004P0000000
Year Built
1930
Reconstructed
1959
Length
56.7 m (186 ft)
Max Span
26.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,341
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.