SR-7 over SR-9

SR-7 over SR-9 · County 053, Utah · Built 2022 · 5 Lanes · 5,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0F 896
Year Built
2022
Length
40.4 m (132.5 ft)
Max Span
39.6 m
Width
35.9 m (117.8 ft)
Lanes
5
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.