HURRICANE CITY ST. over GOULDS WASH

595 SOUTH 180 WEST STREET · County 053, Utah · Built 1992 · 2 Lanes · 504 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
053034F
Year Built
1992
Length
18.9 m (62 ft)
Max Span
17.4 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
504
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.