SR-77 (4TH SOUTH) over UPRR AND FUTURE IPA LINE

At 1450 W.on 4th So.St. · County 049, Utah · Built 2010 · 4 Lanes · 29,985 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
0F 769
Year Built
2010
Length
86.4 m (283.5 ft)
Max Span
44.5 m
Width
32.6 m (107 ft)
Lanes
4
Daily Traffic
29,985
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.