SR-77 (4th SOUTH) over UPRR and 4th WEST ST.

At 400 W. in Springville · County 049, Utah · Built 2010 · 4 Lanes · 17,720 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0F 770A
Year Built
2010
Length
47.5 m (155.8 ft)
Max Span
46.6 m
Width
23.4 m (76.8 ft)
Lanes
4
Daily Traffic
17,720
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.