200 SO.ST.-HOLDEN over I-15 (SR-15) NBL & S

EAST SIDE OF HOLDEN · County 027, Utah · Built 1976 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0F 334
Year Built
1976
Length
122.7 m (402.6 ft)
Max Span
32.6 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
2,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.