Cemetery Ln over I-15 NB & SB

1 MI.SO.MONA INTERCHANGE · County 023, Utah · Built 1974 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0F 325
Year Built
1974
Length
84.9 m (278.5 ft)
Max Span
33.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.