SR-28 over I-15 (SR-15) NBL & S
NORTH NEPHI INTERCHANGE · County 023, Utah · Built 1984 · 3 Lanes · 7,336 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
39.748472, -111.834736
This bridge is in worse condition than 96.7% of bridges in County 023. The average bridge in Utah is 0 years old; this one is 42 years old.
Nearby Bridges
COUNTY ROAD over I-15 (SR-15) NBL AND SBL
Built 1982
I-15 (SR-15) SBL over 700 NORTH STREET NEPHI
Built 1982
I-15 (SR-15) NBL over 700 NORTH STREET NEPHI
Built 1982
SR-28 over SALT CREEK
Built 1924
I-15 NB over Deer Crossing
Built 1974
I-15 SB over DEER CROSSING
Built 1974
I-15 (SR-15) over SALT CREEK
Built 1982
I-15 (SR-15) SBL over SR-132 INTCHG. X-ROAD
Built 1982
I-15 (SR-15) NBL over SR-132 INTCHG. X-ROAD
Built 1982
SR-132 over Salt Creek
Built 1999
Bridge Details
- Structure #
- 0C 717
- Year Built
- 1984
- Reconstructed
- 2006
- Length
- 120.1 m (394 ft)
- Max Span
- 63.5 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 3
- Daily Traffic
- 7,336
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.