SR-24 over SAN RAFAEL RIVER

6 MILES SOUTH OF JCT I-70 · County 015, Utah · Built 1971 · 2 Lanes · 781 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0F 202
Year Built
1971
Length
64.8 m (212.6 ft)
Max Span
21.4 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
781
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.