SR-24 over SAN RAFAEL RIVER
6 MILES SOUTH OF JCT I-70 · County 015, Utah · Built 1971 · 2 Lanes · 781 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.859394, -110.371167
This bridge is in worse condition than 46.4% of bridges in County 015. The average bridge in Utah is 0 years old; this one is 55 years old.
Nearby Bridges
SR-24 over HATTS RANCH WASH
Built 1971
SR-24 over GREASEWOOD WASH
Built 1971
SR-24 over BUCKMASTER WASH
Built 1965
I-70EB & EB OF over BUCKMASTER WASH
Built 1972
I-70 (SR-70) WB over BUCKMASTER WASH
Built 1967
SR-24 INT. X-ROAD over I-70 (SR-70) EBL & W
Built 1972
I-70 (SR-70) EBL over SAN RAFAEL RIVER
Built 1967
I-70 (SR-70) WBL over SAN RAFAEL RIVER
Built 1973
I-70 (SR-70) EB over Buckmaster Wash
Built 1967
I-70 (SR-70) EB over BUCKMASTER WASH
Built 1972
Bridge Details
- Structure #
- 0F 202
- Year Built
- 1971
- Length
- 64.8 m (212.6 ft)
- Max Span
- 21.4 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 781
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.