SR-24 INT. X-ROAD over I-70 (SR-70) EBL & W
13 MI. W. OF GREEN RIVER · County 015, Utah · Built 1972 · 2 Lanes · 781 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.923383, -110.376511
This bridge is in worse condition than 46.4% of bridges in County 015. The average bridge in Utah is 0 years old; this one is 54 years old.
Nearby Bridges
I-70 (SR-70) WB over BUCKMASTER WASH
Built 1967
I-70EB & EB OF over BUCKMASTER WASH
Built 1972
SR-24 over BUCKMASTER WASH
Built 1965
I-70 (SR-70) EB over Buckmaster Wash
Built 1967
I-70 (SR-70) EB over BUCKMASTER WASH
Built 1972
I-70 (SR-70) WBL over SAN RAFAEL RIVER
Built 1973
I-70 (SR-70) EBL over SAN RAFAEL RIVER
Built 1967
I-70 (SR-70) over SPOTTED WOLF WASH
Built 1968
SR-24 over HATTS RANCH WASH
Built 1971
SR-24 over SAN RAFAEL RIVER
Built 1971
Bridge Details
- Structure #
- 0C 455
- Year Built
- 1972
- Length
- 116.1 m (380.9 ft)
- Max Span
- 43 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 781
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.