SR-112 over TRAIL AND DRAINAGE DITCH
1.5 Mi.W from Jct. SR-36 · County 045, Utah · Built 2009 · 2 Lanes · 5,190 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.550758, -112.326961
This bridge is in worse condition than 8.6% of bridges in County 045. The average bridge in Utah is 0 years old; this one is 17 years old.
Bridge Details
- Structure #
- 0E2621
- Year Built
- 2009
- Length
- 6.6 m (21.7 ft)
- Max Span
- 6.1 m
- Width
- 34.7 m (113.8 ft)
- Lanes
- 2
- Daily Traffic
- 5,190
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.