SR-128 over MAT MARTIN POINT WASH

14.4 MILES NORTH OF MOAB · County 019, Utah · Built 2005 · 2 Lanes · 1,120 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
0E2532
Year Built
2005
Length
6.8 m (22.3 ft)
Max Span
6.2 m
Lanes
2
Daily Traffic
1,120
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.