SR-128 over IDA'S GULCH
18.7 MILES NORTH OF MOAB · County 019, Utah · Built 1970 · 2 Lanes · 364 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
38.69265, -109.409767
This bridge is in worse condition than 80.2% of bridges in County 019. The average bridge in Utah is 0 years old; this one is 56 years old.
Nearby Bridges
SR-128 over CASTLE CREEK
Built 1999
SR-128 over PROFESSOR CREEK
Built 1985
SR-128 over MAT MARTIN POINT WASH
Built 2005
COUNTY ROAD over CASTLE CREEK
Built 1950
SR-128 over ONION CREEK
Built 1985
SR-128 over BIG BEND WASH
Built 1959
SR-128 over HAL CANYON WASH
Built 2000
COUNTY ROAD over ONION CREEK
Built 1953
SR-128 over JACKASS CANYON WASH
Built 1960
PARK ENTRANCE ROAD over SALT VALLEY WASH
Built 1960
Bridge Details
- Structure #
- 0A 421
- Year Built
- 1970
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.7 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 364
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.