US-89 (SR-89) over PETRIFIED HOLLOW WASH
18 MILES EAST OF KANAB · County 025, Utah · Built 1958 · 2 Lanes · 3,499 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
37.050489, -112.204517
This bridge is in worse condition than 36.7% of bridges in County 025. The average bridge in Utah is 0 years old; this one is 68 years old.
Bridge Details
- Structure #
- 0E1107
- Year Built
- 1958
- Length
- 9.6 m (31.5 ft)
- Max Span
- 8.9 m
- Lanes
- 2
- Daily Traffic
- 3,499
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.