JOHNSON CYN. ROAD over JOHNSON CANYON CREEK

9 MILES NE. OF KANAB · County 025, Utah · Built 1976 · 2 Lanes · 259 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
025001E
Year Built
1976
Length
17.8 m (58.4 ft)
Max Span
6.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
259
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.