COUNTY ROAD over I-80 (SR-80) EBL and WBL

3.8 MI.NORTHEAST WANSHIP · County 043, Utah · Built 1967 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0C 433
Year Built
1967
Reconstructed
2015
Length
115 m (377.3 ft)
Max Span
29 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.