COUNTY ROAD over I-80 (SR-80) EBL & WBL

6.6 MI.NORTHEAST WANSHIP · County 043, Utah · Built 1967 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0C 434
Year Built
1967
Reconstructed
2015
Length
91.4 m (299.9 ft)
Max Span
22.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.