RIVERSIDE DRIVE over RIM ROCK WASH

RIVERSIDE DR.IN ST.GEORGE · County 053, Utah · Built 2008 · 4 Lanes · 500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
053067D
Year Built
2008
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
30.3 m (99.4 ft)
Lanes
4
Daily Traffic
500
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.