FT. PIERCE DRIVE over FT. PIERCE WASH
SO. END BLOOMINGTON HILLS · County 053, Utah · Built 1993 · 2 Lanes · 4,158 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
37.074056, -113.559331
This bridge is in worse condition than 41.2% of bridges in County 053. The average bridge in Utah is 0 years old; this one is 33 years old.
Nearby Bridges
RIVER ROAD over VIRGIN RIVER
Built 1992
RIVERSIDE DRIVE over RIM ROCK WASH
Built 2008
ST.GEORGE CITY ST. over FT. PIERCE WASH
Built 1951
DIXIE DR INT.X-RD. over CONVENTION CENTER DRIVE
Built 2012
I-15NB OFF-RAMP over SANTA CLARA RIVER
Built 2012
I-15NB (SR-15) over SANTA CLARA RIVER
Built 2012
I-15SB (SR-15) over SANTA CLARA RIVER
Built 2012
I-15 over Virgin River
Built 2017
DIXIE DR. INT.X-RD over I-15 (SR-15)
Built 2012
I-15SB ON-RAMP over SANTA CLARA RIVER
Built 2012
Bridge Details
- Structure #
- 053002E
- Year Built
- 1993
- Length
- 32.4 m (106.3 ft)
- Max Span
- 3.7 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 4,158
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.