SNOW CYN. PARKWAY over SAND HOLLOW WASH
NORTH SIDE OF ST. GEORGE · County 053, Utah · Built 1999 · 4 Lanes · 13,482 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
37.161167, -113.640522
This bridge is in worse condition than 87.6% of bridges in County 053. The average bridge in Utah is 0 years old; this one is 27 years old.
Nearby Bridges
2000 NORTH STREET over SNOW CANYON WASH
Built 1990
GATES LANE over SANTA CLARA RIVER
Built 2008
SNOW CYN. PARKWAY over HALFWAY WASH
Built 1999
LEDGES INT. X-ROAD over SR-18
Built 2005
COUNTY ROAD over SAND HOLLOW WASH
Built 1994
1400 WEST STREET over HALFWAY WASH
Built 1999
SB Bluff St SR-18 over Snow Canyon Parkway
Built 2014
NB Bluff St SR-18 over Red Hills Parkway
Built 2014
SR-8 over HALFWAY WASH
Built 1986
STONEBRIDGE ROAD over SAND HOLLOW WASH
Built 1999
Bridge Details
- Structure #
- 053009E
- Year Built
- 1999
- Length
- 15.9 m (52.2 ft)
- Max Span
- 3.7 m
- Lanes
- 4
- Daily Traffic
- 13,482
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.