COUNTY ROAD over SAND HOLLOW WASH

WEST SIDE OF ST. GEORGE · County 053, Utah · Built 1994 · 5 Lanes · 46,785 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
053075E
Year Built
1994
Length
9.4 m (30.8 ft)
Max Span
4.3 m
Width
30.5 m (100.1 ft)
Lanes
5
Daily Traffic
46,785
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.