WASATCH COUNTY RD over PROVO RIVER
3.5 MI. NW. OF HEBER CITY · County 051, Utah · Built 1956 · 2 Lanes · 851 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.55425, -111.433283
This bridge is in worse condition than 68.8% of bridges in County 051. The average bridge in Utah is 0 years old; this one is 70 years old.
Nearby Bridges
SR-40 (US-40) over NORTHFIELD CANAL
Built 1989
US-40 (SR-40) WBL over PROVO RIVER & ACCESS RD.
Built 1989
US-40 (SR-40) EBL over PROVO RIVER & ACCESS RD.
Built 1989
SR-40 (US-40) over COTTONWOOD CANYON ROAD
Built 1989
SR-113 over SPRING CREEK
Built 1972
SR-113 over PROVO RIVER
Built 1942
US-40 WB over Future County Road
Built 2020
US-40 EB over Future County Road
Built 2020
SR-319 INT.X-RD over US-40 (SR-40) EBL & WBL
Built 1990
SUBDVN.ACCESS ROAD over SR-224 GUARDSMAN PASS
Built 2008
Bridge Details
- Structure #
- 051009D
- Year Built
- 1956
- Length
- 22.9 m (75.1 ft)
- Max Span
- 18.9 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 851
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.