CHARLESTON CEM.RD. over DANIELS DRY CREEK

SOUTH SIDE OF CHARLESTON · County 051, Utah · Built 1985 · 2 Lanes · 44 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
051005C
Year Built
1985
Length
9 m (29.5 ft)
Max Span
8.5 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
44
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.