800 NORTH STREET over PROVO RIVER

850 W. 800 N. PROVO · County 049, Utah · Built 1960 · 2 Lanes · 15,059 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
049010D
Year Built
1960
Length
24.4 m (80.1 ft)
Max Span
21.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
15,059
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.