1300 NORTH STREET over LAYTON CANAL

4050 W.1300 N. WEST POINT · County 011, Utah · Built 1950 · 2 Lanes · 504 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011011D
Year Built
1950
Length
9 m (29.5 ft)
Max Span
4.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
504
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.