SR-107 over CITY STREET AND UPRR
300 NO.ST.in CLEARFIELD · County 011, Utah · Built 1974 · 2 Lanes · 10,704 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.118061, -112.031914
This bridge is in worse condition than 83% of bridges in County 011. The average bridge in Utah is 0 years old; this one is 52 years old.
Nearby Bridges
BRUCE STREET over WEBER-DAVIS CANAL
Built 1974
800 NORTH STREET over UPRR/Front Runner
Built 1985
200 SOUTH STREET over UNION PACIFIC RAILROAD
Built 2000
I-15 (SR-15) SBL over SR-103 W. GATE HILL AFB
Built 1966
I-15 (SR-15) NBL over SR-103 W. GATE HILL AFB
Built 1966
300 NORTH STREET over WEBER-DAVIS CANAL
Built 1965
SR-193 over UPRR & UTA TRACKS
Built 2013
I-15 SB over 200 S
Built 2020
I-15 NB over 200 S
Built 2022
SR-126 over WEBER-DAVIS CO. CANAL
Built 1948
Bridge Details
- Structure #
- 0F 330
- Year Built
- 1974
- Reconstructed
- 2015
- Length
- 289.3 m (949.1 ft)
- Max Span
- 33.5 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 10,704
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.