AVE G over UNK CREEK

NFH @ AVE G · County 099, Texas · Built 1960 · 2 Lanes · 50 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
DAPFORHOO000F02
Year Built
1960
Length
9.3 m (30.5 ft)
Max Span
1.5 m
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.