SH 36 over LEON RIVER

3.60 MI S OF US 84 · County 099, Texas · Built 1941 · 3 Lanes · 5,173 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
090500018401008
Year Built
1941
Reconstructed
1992
Length
272.8 m (895 ft)
Max Span
27.4 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
5,173
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,300,000
Total Project Cost
$5,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.