CR P over Salt Creek

1.2 MI E. of FM 592 · County 483, Texas · Built 2020 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

35.387869, -100.09115

This bridge is in worse condition than 51% of bridges in County 483. The average bridge in Texas is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
252420AA0148003
Year Built
2020
Length
21.3 m (69.9 ft)
Max Span
21.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.