FM 2697 over DRAW
2.90 MI E OF FM 592 · County 483, Texas · Built 1980 · 2 Lanes · 1,350 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.400897, -100.060108
This bridge is in worse condition than 51% of bridges in County 483. The average bridge in Texas is 0 years old; this one is 46 years old.
Nearby Bridges
CR P over DRAW
Built 1984
CR P over Salt Creek
Built 2020
FM 2697 over SALT CREEK
Built 1962
CR 28 over SWEETWATER CREEK
Built 2019
FM 592 over SALT CREEK
Built 1984
CR 29 over SWEETWATER CREEK
Built 1973
N1670 over SWEETWATER CREEK
Built 1988
S.H. 152 over SWEETWATER CREEK
Built 2013
E1080 over MERIDIAN CREEK
Built 1981
N1680 over CREEK
Built 1940
Bridge Details
- Structure #
- 252420263201002
- Year Built
- 1980
- Reconstructed
- 2016
- Length
- 7 m (23 ft)
- Max Span
- 2.1 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,350
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.