FM 509 over MAIN IRRIGATION CANAL
0.60 MI S OF FM 675 · County 061, Texas · Built 1996 · 2 Lanes · 4,984 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
26.084572, -97.740239
This bridge is in worse condition than 14.7% of bridges in County 061. The average bridge in Texas is 0 years old; this one is 30 years old.
Nearby Bridges
FM 509 over OCELOT CROSSING
Built 1996
TURNER RD over HARLINGEN MAIN CANAL
Built 1960
HACKBERRY ROAD over HARLINGEN MAIN CANAL
Built 1960
JIMENEZ RD over HARLINGEN MAIN CANAL
Built 1960
FM 675 over RIGHT HIGH LEVEL CANAL
Built 2007
FM 675 over LOW LINE CANAL
Built 2007
US 281 over SAN BENITO LOW LEVEL CAN
Built 1955
US 281 over SAN BENITO HI LVL CANAL
Built 1955
FM 800 over DRAINAGE DITCH
Built 2003
FM 800 over DRAINAGE DITCH
Built 1966
Bridge Details
- Structure #
- 210310106501006
- Year Built
- 1996
- Length
- 15.2 m (49.9 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 4,984
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.