FM 509 over OCELOT CROSSING
0.50 MI S OF FM 675 · County 061, Texas · Built 1996 · 2 Lanes · 4,746 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.087042, -97.745606
This bridge is in worse condition than 14.7% of bridges in County 061. The average bridge in Texas is 0 years old; this one is 30 years old.
Nearby Bridges
FM 509 over MAIN IRRIGATION CANAL
Built 1996
HACKBERRY ROAD over HARLINGEN MAIN CANAL
Built 1960
TURNER RD over HARLINGEN MAIN CANAL
Built 1960
JIMENEZ RD over HARLINGEN MAIN CANAL
Built 1960
FM 675 over RIGHT HIGH LEVEL CANAL
Built 2007
FM 800 over DRAINAGE DITCH
Built 2003
US 281 over SAN BENITO HI LVL CANAL
Built 1955
US 281 over SAN BENITO LOW LEVEL CAN
Built 1955
FM 675 over LOW LINE CANAL
Built 2007
FM 800 over DRAINAGE DITCH
Built 2003
Bridge Details
- Structure #
- 210310106501005
- Year Built
- 1996
- Length
- 12.2 m (40 ft)
- Max Span
- 12.2 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,746
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.