US 83 EB EXIT RAMP over RVSC RR / PALM COURT DR

0.20 MI W OF US 77 · County 061, Texas · Built 2002 · 1 Lanes · 60,904 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
210310003919292
Year Built
2002
Length
166.7 m (546.9 ft)
Max Span
35.1 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
60,904
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.