US 77/83 E-N CONN over US 77 BU 83 WB & SP 54

US 77/83 INTERCHANGE · County 061, Texas · Built 2002 · 1 Lanes · 6,786 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
210310003919291
Year Built
2002
Length
1089.1 m (3573.2 ft)
Max Span
70.1 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
6,786
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.