US 77 NB over LINE M RD

1.52 MI SE OF SH 345 · County 061, Texas · Built 2005 · 3 Lanes · 22,880 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
210310003907372
Year Built
2005
Length
71 m (232.9 ft)
Max Span
35.7 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
22,880
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.