US 77 BUSINESS SB over BRAZOS RIVER
0.5 MI N OF FM 434 · County 309, Texas · Built 1961 · 3 Lanes · 4,853 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
26.111647, -97.606167
This bridge is in worse condition than 90.8% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 65 years old.
Nearby Bridges
FM 732 over Drainage Ditch
Built 1958
BUS 77 NB over Drainage Ditch
Built 1958
US 77 NB over FM 732 UP RR US 77 BUS
Built 2005
BUS 77 SB over Drainage Ditch
Built 1950
IOWA GARDENS ROAD over DRAINAGE DITCH
Built 2005
US 77 SB over FM 732 UPRR US 77 BUS
Built 2005
SHERER RD over DRAINAGE DITCH
Built 2005
US 77 NB over LINE M RD
Built 2005
US 77 SB over LINE M RD
Built 2005
FM 510 over DRAINAGE DITCH
Built 1975
Bridge Details
- Structure #
- 091610001410170
- Year Built
- 1961
- Length
- 271.6 m (891.1 ft)
- Max Span
- 49.4 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 3
- Daily Traffic
- 4,853
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,300,000
- Total Project Cost
- $6,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.