ALLIE PAYNE over DRAINAGE DITCH
0.9 MI E OF SH 87 · County 361, Texas · Built 2015 · 2 Lanes · 388 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
30.143233, -93.736022
This bridge is in worse condition than 31.3% of bridges in County 361. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
FM 3247 over LITTLE CYPRESS BAYOU
Built 1962
SH 87 over LITTLE CYPRESS BAYOU
Built 1950
IH 10 over SH 87
Built 2018
IH 10 WB over US 90 BUS
Built 1959
IH 10 over US 90 BUS (Simmons Dr)
Built 2020
FM 1130 over CHEROKEE TRAIL OUTFALL
Built 2002
IH 10 over Little Cypress Bayou
Built 2020
IH 10 over Turnarounds
Built 2018
BEAR PATH RD over CYPRESS BAYOU
Built 1996
IH 10 over Sabine River Relief
Built 1953
Bridge Details
- Structure #
- 201810B00113001
- Year Built
- 2015
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 388
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.