FM 1130 over CHEROKEE TRAIL OUTFALL

0.40 MI N OF FM 3247 · County 361, Texas · Built 2002 · 5 Lanes · 5,627 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
201810128401011
Year Built
2002
Length
8.5 m (27.9 ft)
Max Span
2.1 m
Lanes
5
Daily Traffic
5,627
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.