W 7TH ST over PIPELINES
0.4 MI S OF SH 82 · County 245, Texas · Built 1960 · 2 Lanes · 6,963 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
29.853864, -93.956058
This bridge is in worse condition than 60.7% of bridges in County 245. The average bridge in Texas is 0 years old; this one is 66 years old.
Nearby Bridges
SH 82 over INTRACOASTAL CANAL
Built 1970
SH 87 over Refinery Pipelines
Built 1930
SH 87 over Refinery Pipelines
Built 1930
SH 87 over Taylors Bayou
Built 1967
SH 82 over Alligator Bayou
Built 2013
SH 87 over Intracoastal Canal
Built 1971
SPUR 215 over ALLIGATOR BAYOU
Built 1961
SH 73 over SH 82
Built 1960
25TH ST over ZAWALLE OUTFALL
Built 1978
SH 73 EB over Gulf Freshwater Canal
Built 1952
Bridge Details
- Structure #
- 201240C01520001
- Year Built
- 1960
- Length
- 32.8 m (107.6 ft)
- Max Span
- 6.2 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,963
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.